Customization: | Available |
---|---|
Task: | Program |
Structure: | Closed-Loop |
Still deciding? Get samples of US$ 18/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Digital Motor Protector/ Single Phase MOTOR STARTER
Model | MP-S1 |
Application | Start & protect single phase pump, DOL |
Main technical data | |
. rated input voltage | AC220V-AC24V Single phase 50HZ/ 60HZ |
. rated output | 0.37kw-2.2kw (0.5hp-3hp) |
Product function / features | Over load protection Motor stalled protection Dry run protection with sensor free Under voltage protection Over voltage protection Transient surge protection Memory function when power off & recovery LCD screen displaying pump running status Push button calibration Reserved space for installing pump start capacitor |
Main installation data | |
Working temperature | -25ºC-- +55ºC |
Working humidity | 20%--90%RH, no drips concreted |
Degree of protection | IP54 |
Install position | Wall mounting |
Unit dimension (L x W x H) | 152 x 125 x 70 mm |
Unit weight | 380g |
Can i have some samples ?
Yes ,we can send you samples for testing,contact us for details
What's delivery time ?
For standard pump control panel ,it usually takes about 7 working days;
For non-standard,it usually takes 15-20days ,please contact us for details;
Can I do OEM or ODM ?
Yes,we have our own engineering team and we do accept OEM and ODM,but there is ordering quantity requirement;
How does your factory do the quality control ?
Our production process follow up the ISO standard and we control the product quality from the raw materials to the finished product,each of our control panel will be fully assembled and strictly tested before packing and shipping ;
What is the approximate life time for your control panel ?
The designed life time of control panel is 8 years ;
What is your after sales service policy ?
According to the ordering quantity,we will give some free spare parts or controller for maintenance or replacement and we will give technical training;
How can i trust you ?
We have being developing the pump control panel manufacturing and selling for 15 years ,now many pump supplier from China and overseas are using our controller to control and protect their pump and motor.
Where is your location and transportation guide?
From Guangzhou to Changsha takes 1hour by air, 2.5hour by high speed train
From Shanghai to Changsha takes 1.5hour by air, 5hour by high speed train
From Beijing to Changsha takes 2.5hour by air
From Hong Kong to Changsha takes 2hour by air