Customization: | Available |
---|---|
Task: | Program |
Structure: | Closed-Loop |
Still deciding? Get samples of US$ 87/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
RO Controller/ Single Phase Pump Control Panel
Application | Design for reverse osmosis water purification unit , DOL |
Model | RO-2-3 |
Rated input voltage |
AC380V Three phase |
Rated input voltage for RAW Water Pump(RWP) High Pressure Pump(HPP) Solenoid valve |
Single phase(0.37-2.2kw) |
Normally closed type(AC 220V.) | |
Protection function |
Over load protection |
Control characteristic |
Present terminal port for Pressure switch(LPS /HPS), |
Other features |
Pump accumulative running time displaying |
Main installation data | |
Working temperature | -25ºC-- +55ºC |
Working humidity | 20%--90%RH, no drips concreted |
Degree of protection | IP54 |
Install position | Wall mounting |
Unit dimension (L x W x H) | 300*240*120mm |
Can i have some samples ?
Yes ,we can send you samples for testing,contact us for details
What's delivery time ?
For standard pump control panel ,it usually takes about 7 working days;
For non-standard,it usually takes 15-20days ,please contact us for details;
Can I do OEM or ODM ?
Yes,we have our own engineering team and we do accept OEM and ODM,but there is ordering quantity requirement;
How does your factory do the quality control ?
Our production process follow up the ISO standard and we control the product quality from the raw materials to the finished product,each of our control panel will be fully assembled and strictly tested before packing and shipping ;
What is the approximate life time for your control panel ?
The designed life time of control panel is 8 years ;
What is your after sales service policy ?
According to the ordering quantity,we will give some free spare parts or controller for maintenance or replacement and we will give technical training;
How can i trust you ?
We have being developing the pump control panel manufacturing and selling for 15 years ,now many pump supplier from China and overseas are using our controller to control and protect their pump and motor.
Where is your location and transportation guide?
From Guangzhou to Changsha takes 1hour by air, 2.5hour by high speed train
From Shanghai to Changsha takes 1.5hour by air, 5hour by high speed train
From Beijing to Changsha takes 2.5hour by air
From Hong Kong to Changsha takes 2hour by air