Customization: | Available |
---|---|
Task: | Program |
Structure: | Closed-Loop |
Still deciding? Get samples of US$ 85/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
General details | |
Model | L932-B |
Main technical data | |
Start type | Direct on line |
Qty of controlled pump | Dublex pump |
Rated input voltage | AC380V/AC400V Three Phase 50HZ/ 60HZ |
Rated output power | 0. 75kw-4kw (1hp-5.5hp) 5.5kw-11kw (7.5hp-15hp) 15kw (20hp) |
Protection function |
Over load protection Pump stalled protection Dry run protection with sensor free Under voltage protection Over voltage protection Repeat start protection Over temperature protection Phase reversal protection Open phase protection |
Application & Control characteristic |
Connecting 0.5-4.5V pressure transmitter to replace pressure switch Duplex pump control
.Main pump / standby pump automatically alternate
.Main pump / standby pump automatically switch against malfunction
.Standby pump participate running if required
|
Other features | LCD screen displaying dynamic real time pressure value & pump running status Pump shaft anti-rust Pump accumulative running time displaying Pump last five faults record displaying Present one dry contact point (BA port) Present RS485 port Present user remote monitor LCD screen locked function under Auto state Push button calibration |
Main installation data | |
Working temperature Working humidity Degree of protection Install position Unit dimension (L x W x H) |
-25ºC-- +55ºC 20%--90%RH, no drips concreted IP54 Wall mounting 300×240×120mm |
Can i have some samples ?
Yes ,we can send you samples for testing,contact us for details
What's delivery time ?
For standard pump control panel ,it usually takes about 7 working days;
For non-standard,it usually takes 15-20days ,please contact us for details;
Can I do OEM or ODM ?
Yes,we have our own engineering team and we do accept OEM and ODM,but there is ordering quantity requirement;
How does your factory do the quality control ?
Our production process follow up the ISO standard and we control the product quality from the raw materials to the finished product,each of our control panel will be fully assembled and strictly tested before packing and shipping ;
What is the approximate life time for your control panel ?
The designed life time of control panel is 8 years ;
What is your after sales service policy ?
According to the ordering quantity,we will give some free spare parts or controller for maintenance or replacement and we will give technical training;
How can i trust you ?
We have being developing the pump control panel manufacturing and selling for 15 years ,now many pump supplier from China and overseas are using our controller to control and protect their pump and motor.
Where is your location and transportation guide?
From Guangzhou to Changsha takes 1hour by air, 2.5hour by high speed train
From Shanghai to Changsha takes 1.5hour by air, 5hour by high speed train
From Beijing to Changsha takes 2.5hour by air
From Hong Kong to Changsha takes 2hour by air